Search

<span class="text-white">International - standard</span><br /> Industrial Ecosystem

International - standard
Industrial Ecosystem

Master-planned across eight functional land-use groups, the VB Quang Yen Industrial Park creates an integrated ecosystem for efficient operations and sustainable growth.

407.71 HA

TOTAL INDUSTRIAL PARK AREA

86.43 HA

PORT AND LOGISTICS LAND

165.14 MVA

POWER SUPPLY CAPACITY

15,000 M³/DAY

WASTEWATER TREATMENT CAPACITY

Strategic Location

At the Nexus of Northern Vietnam's Logistics Corridor

VB Quang Yen Industrial Park sits within the Quang Yen Coastal Economic Zone — a government-priority investment area with unmatched multimodal access to seaports, airports, expressways and international border crossings.

Lach Huyen Port

15km

Huu Nghi Border Gate

122km

Dinh Vu Port

7km

Mong Cai Border Gate

140km

Cat Bi International Airport

7km

Gia Binh Airport

112km

At the Nexus of Northern Vietnam's Logistics Corridor

THE INVESTMENT CASE

Four Pillars. One Compelling Opportunity

01

Strategic location and connectivity

Located within the Quang Yen Coastal Economic Zone, the industrial park adjoins the Ha Long – Hai Phong Expressway and connects to the transport and seaport network of northern Vietnam's economic region

02

A port-integrated industrial park

Under the zoning plan, 86.43 hectares are allocated to port, port services, and logistics, supporting supply chain optimization and import and export activities

03

Investment incentive policy

3. investment incentive policy A preferential corporate income tax (CIT) rate of 17% for 10 years; a tax exemption for up to 2 years followed by a 50% reduction of the payable tax for up to 4 subsequent years — compared with the standard CIT rate of 20%.

04

Green development, long-term investment

Environmental infrastructure and flood protection measures are proactively designed, combined with a green manufacturing orientation and a 70-year operating term

Master Plan

World-Class Infrastructure

Technical infrastructure is planned to be fully integrated and modern, meeting the requirements of manufacturing, transportation and logistics while supporting sustainable growth and strengthening tenants

World-Class Infrastructure

A Platform Built For Wholesale Partners

Our Partnership Model

01

SECURE A LARGE LAND PARCEL

Sublease industrial land in VB Quang Yen under a long-term land use rights agreement.

02

INTRODUCE MANUFACTURERS FROM YOUR HOME MARKET

Leverage your networks to introduce quality tenants.

03

SUPPORT LICENSING, INFRASTRUCTURE & LAUNCH

End-to-end support until your tenants begin operations.

OUR PARTNER PROFILES

  • Industrial Property Funds
  • Regional Developers
  • Investment Agencies
  • Site-Selection Advisors

Infrastructure

Infrastructure That De-Risks Delivery

Water Supply — 24,000 m³/day

Dedicated water treatment plant. Closed-loop distribution with integrated firefighting supply

Wastewater Treatment — 15,000 m³/day

100% collection and treatment; effluent designed to QCVN 40, Column A, with automatic monitoring. Fully separate stormwater and wastewater drainage.

Internal Roads & Land Plots

Grid layout, four cross-sections, ROW 31.5–50.0 m, 6 m setback. Regular rectangular plots: BCR max 70%, max 5 stories, FAR 3.5

Site Leveling & Flood Protection

Road levels +3.43 to +4.50 m (Hon Dau datum). D1 dyke at +4.50 m, above the historical peak tide of +3.3 m. Stormwater designed to a 10-year return period, discharging to the Bach Dang River.

Telecommunications & Underground Works

Fully underground across the park, designed for at least two providers. Underground works max 40% of plot area, max 2 basement levels.

Port & Logistics Land

86.43 ha for industrial production, port, port services and logistics. Public green space 43.91 ha. Positioned as a port-integrated industrial park

Development Roadmap & Investor Assurance

Development Milestones

2024–2025

Planning & Approvals

Masterplan finalized; key approvals secured.

2025–2026

Infrastructure Delivery

Core infrastructure construction & utilities rollout.

2026–2027

Land Handover

Phased land handover based on your acquisition plan.

2027+

Factory Launch

Support tenants to obtain licenses and start operations.

INVESTOR DUE DILIGENCE SUPPORT

  • Legal Documents & Land Certificates
  • Master Plan & Zoning Documents
  • Infrastructure Specifications
  • ESG Framework & Policies
  • Incentive & Policy Briefing

ESG-READY INDUSTRIAL GROWTH

Building sustainable value for your portfolio and the wider ecosystem.

WASTEWATER MANAGEMENT

100%

A planned centralized wastewater treatment plant with an integrated automatic monitoring system

ENERGY-EFFICIENT LIGHTING

LED lighting

Planned for the in-park road lighting system

GREEN SPACE

43.91 ha

Accounting for 10.77% of the total industrial park area

READY TO INVEST?

Let's Build the Future of Manufacturing Together

Receive a personalized investment consultation, project master plan, investment incentives and site visit schedule from our investment specialists.