Sustainability
Sustainability sits at the heart of VB Holdings' vision, bringing together operational efficiency, environmental responsibility and long-term value for businesses, communities and future generations.
OUR COMMITMENT
Growth with responsibility
For VB Holdings, sustainability means aligning economic performance with environmental protection and community benefit. At VB Quang Yen Industrial Park, this principle is built into the plan from the start: centralized wastewater collection and treatment designed to meet QCVN 40 Column A, 40.8 hectares of public green space, and site grading and a D1 dike at +4.50 m designed to cope with storm tides and climate change.
We aim to develop a next-generation industrial park guided by circular economy principles, ESG standards and Vietnam's Net Zero commitment, creating lasting value for investors, the local area and the community.
CLIMATE AND ENERGY
Supporting your low-emissions pathway
Vietnam has committed to reaching net-zero emissions by 2050. For export manufacturers, cutting emissions is fast becoming a requirement from customers and global supply chains. VB Quang Yen Industrial Park is planned so that each manufacturer can pursue its own decarbonization roadmap on its own timeline.
Reliable power: a planned 110/22 kV substation with 3 × 63 MVA capacity, based on 500 kW per hectare of production land.
Energy efficiency: LED street lighting planned for internal roads.
Climate adaptation: Dike D1 designed at +4.50 m, above the historical peak tide of +3.3 m; stormwater drainage designed for a 10-year return period.
Renewable energy: secondary investors may install rooftop solar for self-consumption.
RESOURCE MANAGEMENT
Controlling wastewater and waste at the source
Collection, treatment and monitoring are planned as one integrated system, helping investors meet environmental requirements from their first day of operation.
Separate collection
Fully separate wastewater and stormwater networks, designed for 100% collection.
Centralized treatment
A 15,000 m³/day treatment plant; investors pre-treat to the connection requirements.
Monitoring and discharge
Effluent designed to meet QCVN 40 Column A, with automatic monitoring of flow and concentration.
Wastewater
100% collection to a 15,000 m³/day centralized treatment plant, with effluent designed to meet QCVN 40 Column A and automatic monitoring.
Solid waste
Waste sorting at source is planned; hazardous waste is to be stored separately and collected for treatment on a regular schedule.
Green space and water
40.8 ha of planned public green space (10.01% of the site) and 4.49 ha of water surface, creating ecological buffers within the park.
LONG-TERM VALUE
Sustainability beyond infrastructure
Sustainability is not only about infrastructure. It is also about how we govern the project, support businesses and engage with the community.
Transparent governance
The project is being developed on a clear legal basis, under Decision No. 335/QD-BQLKKT dated 28 June 2026 and Decision No. 402/QD-BQLKKT dated 31 July 2026. Information provided to investors can be checked against these documents.
Jobs and community
The park is projected to create jobs for 24,000–34,000 workers once fully operational, helping drive growth in western Quang Ninh.
Business ecosystem
20.13 ha is set aside for high-tech businesses, small and medium-sized enterprises and innovative companies, under Clause 4, Article 7 of Resolution No. 198/2025/QH15.
Long-term partnership
Support for investors from site research, procedures and construction through to operation and expansion, working together to resolve issues and create lasting value.